YOUR ENERGY SOURCE

Electricity Production and Trade Inc.

Conversion works to be carried out within the scope of waste heat evaluation project at Soma Thermal Power Plant, ▪ Soma E.Ü.T. Start-Up (auxiliary) boiler supply, installation, commissioning, construction work, 13.000.000 kcal/h 16 bar 250°C, ▪ 1st and 2nd units YB Turbine Anistop and Regulation valve heating lines, OB Turbine Regulation valve Heating lines, YB and OB turbine body heating inlet and return lines and performing the necessary tests, ▪ Making the necessary conversion to provide steam from 6 units to be used as a backup to the existing district heating system installed in Soma Thermal Power Plant and ensuring its adaptation to the existing system, ▪ 3rd and 4th. replacement of the heating lines of the steam turbines of the units, ▪ Conversion to give heat to the Soma EÜT 6th unit district heating system