YOUR ENERGY SOURCE

TCK 4th Regional Directorate

ANKARA

Construction of fixed bitumen tanks in the asphalt facilities of the regional directorate and repairing the existing installations, Fixed bitumen tanks in the field of 4th Regional Directorate of Highways, Güvercinlik asphalt facilities (6 pieces of 100 tons, 1 piece of 250 tons, 5 pieces of 500 tons, 5 pieces of 1000 tons and 4 pieces of Construction of 2000-ton) heat center building and perimeter wall