YOUR ENERGY SOURCE
Briefly Isımek
TEDAŞ HEAT CENTER-ANKARA
Heat Center Renovation Work Inside General Directorate Campus of Turkish Electricity Distribution Corporation
Old and existing boilers placed at the heating centers are removed and dismantled. Liquid & natural gas-fired superheated Water Boilers with 2 x 3.000.000 kcal/hr and 2 x 5.000.000 kcal/hr Capacities at 10 Bar operating pressure as a total of 4 units are designed, projected, manufactured, installed and commissioning works are successfully done.
10 Bar Operating Pressure-Liquid and natural gas-fired- Hot Water Boiler 2018